When a protection relay detects a fault, the circuit breaker still has to open, and the supply that opens it has to keep working when AC is lost. In New Zealand network substations, that job falls to a 110Vdc power supply most people never see: a battery-backed DC auxiliary system running at 110V or 125V nominal. Mine switchrooms, data centre substations and renewable connection yards face the same question.

  

How the system fits together

A DC auxiliary power system is a station battery, a charger or rectifier, and DC distribution, working together so protection and control keep running when AC is lost. Where a site also has AC-only equipment, such as communications or CCTV, an inverter can run it from the same battery.

InputAC mains (e.g. 230Vac or 400Vac)
Charger / rectifierConverts AC to the DC bus and float-charges the battery
DC switchboard · protects and isolates each circuit 110V / 125V bus
Station batteryCarries the load on loss of AC
DC loads
Protection relaysTrip and close circuitsSpring-charge motorsSCADA and alarmsEmergency lightingSecurity and fire detection
Inverter · where neededConverts DC from the bus to AC
AC loads
Communications equipmentCCTV and security systems
Simplified. In normal operation the charger carries the standing load; on loss of AC the battery carries everything.
Aerial view of a rural power substation with transformers, switchgear and transmission lines

At a glance

110V or 125V The two common system voltages 110V is the most common protection and control voltage in New Zealand substations, with 125V and 250V at some transmission sites. The switchgear and the asset owner's standard decide which.
97V to 130V What "110V" really means A 110V battery system swings across this range between flat and fully charged, so every connected device has to work across all of it.
8 to 24 hours Backup time if mains fails How long the battery is typically required to carry the site on its own, depending on the site type and asset owner.
N+1 No single point of failure Chargers are built with one more rectifier module than the load needs, so a module can fail or be swapped without losing DC supply.

Where it is used

Any site that owns HV or MV switchgear needs a dependable tripping supply


New Zealand lines companies and Transpower use battery-backed DC for protection and tripping, and the same need comes up on mine sites, data centres and renewable connection projects.

High-voltage substation with switchgear and transmission lines

Substations and network assets

The reference application. Transmission and distribution substations rely on DC auxiliary systems to keep protection, control and SCADA running, and network operators' DC design standards set the benchmark other sectors follow.

Aerial view of a grid-scale battery storage facility beside its connection substation and transmission lines

BESS and renewable connection substations

Large battery storage, solar and wind projects connect through their own substations, usually with a duplicated, battery-backed 110V DC supply so that no single protection failure prevents fault clearance. The connection agreement with Transpower or the local distributor sets the detail.

Mining switchroom corridor lined with grey electrical control cabinets and overhead cable trays

Mining switchrooms and e-houses

Mine sites that run their own HV and MV distribution keep their switchgear in switchrooms or e-houses. The DC supply behind that switchgear raises the same questions a utility faces: which voltage, how many hours of backup, and whether to run two independent systems.

Data centre beside its own high-voltage substation with transformers and transmission towers

Data centre HV substations

Some large data centres now build their own high-voltage substations, complete with redundant protection, SCADA and auxiliary power systems. The trip supply voltage is set by the switchgear specification.

110V or 125V?

There is no single national voltage


New Zealand substations mainly run protection and control on 110V, with 125V and 250V at some transmission sites. The asset owner's standard sets which.

The international switchgear standard, IEC 62271-1, lists 24, 48, 60, 110 or 125, and 220 or 250V as standard DC auxiliary voltages. In practice, the voltage typically follows the type of site.

Typical DC auxiliary voltages by site type
Site typeTypical nominal voltageWhat to know
Distribution and zone substations (11kV and 33kV)110V; 24V or 48V at smaller sitesVaries by network. Vector, for example, has standardised on 110V at its zone substations.
Transmission substations (110kV to 220kV)110V, 125V or 250VOlder sites are often 250V. Redundant battery and charger systems, one for each protection scheme (Main 1 and Main 2).
BESS, solar and wind connection substations110V most commonUsually duplicated, so no single protection failure prevents fault clearance.
Mining, industrial and data centre switchrooms110V or 125VSet by the switchgear specification and the site's electrical standard.
Communications equipment on the same sites48VA separate, lower-voltage DC system, often earthed differently.

The nominal figure labels a range, not a fixed voltage: a typical 110V lead-acid system runs from about 97V fully discharged to about 130V fully charged in cold conditions, and a 125V system from about 103V to 137V. Every relay, coil and motor on the bus has to work across that whole range. Standards vary from network to network, so always confirm the voltage on the switchgear schedule and against the asset owner's own standard.

Station batteries

VRLA, vented lead-acid, NiCd and lithium


The chemistry sets the cell count, the room it needs, how it ages with heat, and how the charger must be configured.

Sealed valve-regulated lead-acid (VRLA) is the most common choice for New Zealand substations: it needs no topping up and can sit in a ventilated relay room. Lithium is gaining ground in telecom and data centre backup, but it isn't yet standard for substation batteries. Vented lead-acid and vented nickel-cadmium (NiCd) batteries remain in many older installations, where they are being phased out or replaced like-for-like.

Station battery types compared
CharacteristicVRLA (sealed lead-acid)Vented lead-acidVented NiCd
Typical cells for 110V nominal54 x 2V cells or 9 x 12V blocks55 cells88 cells
End-of-discharge voltage1.8 V/cell1.8 V/cell1.0 V/cell
TemperatureLife roughly halves for every 10°C rise in average temperatureLess sensitive; no controlled environment neededWide operating range; a 9°C average rise cuts life by around 20%
RoomRelay room with adequate ventilationDedicated battery roomDedicated battery room
MaintenanceNo water additionRegular electrolyte checks and topping upPeriodic maintenance per manufacturer
New buildsThe standard choiceBeing phased outMostly like-for-like replacement

Charger matching

Match the charger to the battery

The cell count difference matters for the charger. Its adjustable range must cover the float and boost voltages of the battery's cell count and chemistry, and its temperature compensation must suit the chemistry. A charger that doesn't suit a replacement battery is a common fault in ageing DC systems.

Generally, VRLA suits temperature-controlled rooms, while NiCd is chosen where temperatures are wide or extreme and long service life matters.

Lithium

Is lithium used for station batteries? Not yet as a standard.

Lithium isn't yet a standard choice for substation batteries, and there are no defined standards for lithium in substation use. Where lithium is trialled, IEC 62619:2022 (battery safety) and IEC 62485-5:2020 (installation) apply.

LFP vs NMC: choosing the right battery chemistry
Substation battery room with duplicated battery racks and charger cabinets

Chargers and rectifiers

Redundancy, recharge and autonomy


The charger supports the batteries and the DC system at the same time and rebuilds the battery after an outage, so its redundancy and performance need to be specified closely.

Engineer inspecting a 110V DC power system cabinet

01

Layer one: duplicated battery and charger systems

Utility substations typically use two independent battery and charger systems, one for each protection scheme (Main 1 and Main 2), often linked by a paralleling arrangement or diodes so a healthy charger can support both sides. Transmission sites usually pair this with dual circuit breaker trip coils, so no single failure stops a fault being cleared.

02

Layer two: N+1 rectifiers inside each charger

Each charger is built from modular rectifiers, with at least one more module than the load needs (N+1), so a module can fail or be replaced without losing the DC supply.

Redundancy Terms Demystified

03

Operating without the battery

Some utility standards require the charger to carry all continuous loads, and even the largest breaker trip, with the battery disconnected. Others size the charger for the continuous load plus battery recharge only. Check which approach the asset owner takes before selecting charger capacity.

Typical autonomy and recharge requirements

RequirementTypical range in utility practice
Battery autonomy on loss of AC8 to 24 hours, depending on site type and how quickly it can be reached; 10 hours is common
Recharge after a full dischargeWithin 5 to 24 hours, depending on the asset owner (for example, 75% within 8 hours and 100% within 24 hours)
Load marginSome standards add 30% growth to the full substation DC load
Temperature compensationRequired, with the probe near the hottest part of the battery, typically mid-rack

Replacing an ageing charger or specifying a new DC system?

Our applications team helps you select the charger or rectifier to suit the battery and redundancy the site requires.

Distribution, protection and earthing

Interrupt DC faults safely, keep systems independent


DC distribution has to interrupt DC fault current safely, keep duplicated systems independent, and flag earth faults before they cause trouble.

Two independent DC systems, X and Y, each with its own charger, battery and DC board feeding its own protection schemeSYSTEM XAC supplyCharger XN+1 rectifier modulesDC board X110V / 125V busBattery XProtection Xrelays and trip coilsSYSTEM YAC supplyCharger YN+1 rectifier modulesDC board Y110V / 125V busBattery YProtection Yrelays and trip coilsLink ordiodes(if fitted)Either system can be isolated and worked on without affecting the other.
Simplified. How the two systems are linked, and whether they are linked at all, varies by asset owner.

01

DC-rated devices, graded throughout

Every DC switchboard component should be rated for DC voltage and current; an AC-rated breaker is not a safe substitute unless the manufacturer gives it a DC rating. DC has no natural current zero, so a DC breaker has to force the arc out, and higher voltages need more breaker poles in series. Polarised DC breakers also need care wherever power flow could reverse.

02

Fuses or circuit breakers: follow the asset owner

Practice differs between asset owners. Some specify circuit breakers or isolators throughout and exclude fuses; others use a battery fuse-disconnector or graded battery fuses, with DC-rated circuit breakers on outgoing circuits. Whichever applies, grade every device with the one upstream.

03

Segregation

Batteries, chargers and switchboards should be segregated so one supply can be isolated and worked on without affecting the other.

04

Unearthed systems and earth faults

Protection and control DC systems are commonly run unearthed (floating) for reliability, while communications DC supplies are often positively earthed. In an unearthed system a single earth fault doesn't stop operation, but a second one is the real risk, so the first must be detected and alarmed.

05

Monitoring and alarms

A typical alarm set, all reported to SCADA. Newer systems add individual cell voltage and impedance monitoring.

  • AC mains fail
  • Charger fail
  • DC high voltage
  • DC low voltage
  • DC earth fault
  • Battery faults

Standards and compliance

The standards behind station batteries and chargers


In New Zealand, IEC standards usually drive station battery and charger specifications, alongside the asset owner's own standard. On Transpower-connected projects, Transpower's technical specifications and grid connection requirements come first.

IEC 62485-2 and 62485-5Safety of stationary battery installations, including ventilation: lead-acid and NiCd, and lithium-ion
IEC 60896-21/-22 and IEC 60623Product standards for VRLA and vented NiCd batteries
IEC 60146-1-1:2024Semiconductor power converters: commonly specified for battery chargers and rectifiers
IEC 61000 seriesElectromagnetic compatibility (EMC) requirements for chargers and rectifiers
AS/NZS 3000:2018Wiring Rules cited by New Zealand's Electricity (Safety) Regulations; grading DC overcurrent and cable protection
IEEE 946-2020Designing stationary DC power systems: batteries, chargers, distribution
AS 2676.1 and AS 2676.2 (2020)Australian battery installation standards, still specified on some NZ projects, at older sites and for battery room ventilation
AS 4044:2024Australian battery charger standard, sometimes specified where Australian consultants or utility templates are involved
IEC 61557-8:2014Insulation monitoring for unearthed DC systems
A note on AS/NZS 5139It's sometimes assumed to apply, but its scope excludes premises with critical power continuity requirements, giving substation support and black start as examples.

Sizing

Sizing the battery and charger


Sizing turns the load profile into a battery capacity and charger rating. The main inputs are the continuous load, the momentary trip, close and spring-charge loads, the autonomy and the recharge time, and the governing methods are IEEE 485-2020 (lead-acid) and IEEE 1115-2025 (NiCd).

When it is not the approach used

Not every 110Vdc power supply is a tripping supply


AC control with capacitor trip

Some MV switchgear is controlled from AC control power instead, with a capacitor trip device storing the energy to trip each breaker. The trade-off: a battery is the more dependable control source because it is isolated from the AC system, but it needs periodic maintenance and loses capacity at low temperature.

A power supply without a battery

A 110Vdc AC-DC power supply without a battery stops when the mains stops, so it suits control loads that can drop out, not protection.

Systems and products

110V and 125V DC power systems, engineered and built to your specification


We design and build complete DC power systems around your site's requirements, from specification review and design through to compliance and commissioning support.

Each system is built from proven rectifiers, chargers, inverters, distribution and batteries, so you deal with one accountable supplier for the whole system rather than coordinating several.

Duplicated 110V DC power system in two open cabinets with rectifiers and distribution
A duplicated 110V DC power system ready for dispatch: two independent cabinets, each with its own rectifiers, controller, distribution and battery shelving.
110V DC system cabinet showing AC input protection, DC distribution, controller and rectifier modules

Inside a typical build

One cabinet, ready to connect

  1. AC input protectionMains circuit breaker and surge protection on the incoming supply.
  2. DC distributionLabelled DC circuit breakers, one for each outgoing load circuit.
  3. Load terminalsClearly labelled terminals for the outgoing load wiring.
  4. System controllerMonitors the system, manages battery charging and raises alarms.
  5. Battery protectionA dedicated battery circuit breaker.
  6. Alarm and control connectionsDigital inputs and relay outputs for SCADA and remote alarms.
  7. Rectifier modulesHot-swappable modules, sized with redundancy where the specification calls for it.

How we deliver it

From specification to commissioning support

  1. 01

    Specification review

    We review your specification, load profile and the asset owner's standard, and flag gaps early.

  2. 02

    Design and compliance

    We design the system and select the rectifiers, batteries and distribution to suit the site and the applicable standards.

  3. 03

    Build and test

    Each system is assembled, wired and tested before it leaves us.

  4. 04

    Commissioning support

    Our team provides remote technical support while your contractor commissions the system on site.

  5. 05

    Ongoing support

    Technical support after handover, from the same team that designed the system.

Engineer inspecting a 110V DC power system cabinet

Products

Need individual products?

We also supply the system components on their own, for replacements, upgrades and other system builders: 110V-class battery chargers from Schaefer and Camtec, and Premium inverters for AC loads.

Browse the battery chargers, DC power systems and DC/AC inverters collections. Suitability for 125V and NiCd batteries depends on the model: the adjustable range must cover the battery's float and boost voltages.

Before you specify

What to confirm in a 110V or 125V DC specification


State each of these explicitly in the specification, then bring it to us for product selection.

Nominal voltage and cell count, and that every connected device works across the battery's full voltage range

Continuous and momentary (trip, close, spring-charge) loads as separate figures

Backup time on loss of AC, and recharge time after a full discharge

Redundancy: duplicated batteries and chargers, N+1 rectifiers, and whether the charger must run with the battery disconnected

Battery chemistry, with a charger range and temperature compensation to suit

DC-rated, graded protection, earth fault detection and alarms to SCADA

FAQs

Frequently asked questions


What is a 110Vdc power supply in a substation?

A 110Vdc power supply in a substation is a battery-backed DC auxiliary system made up of a station battery, a charger or rectifier, and DC distribution. It powers protection relays, breaker trip and close circuits, spring-charge motors, SCADA and alarms, and keeps them running when the AC supply is lost. A 110V VRLA system commonly uses 54 cells.

What is the difference between a 110V and a 125V DC system?

A 110V and a 125V DC system differ mainly in cell count and operating range. A typical 110V lead-acid system uses 54 cells and runs from about 97V to 130V; a 125V system uses around 57 cells and runs from about 103V to 137V. 110V is the most common in New Zealand, with 125V at some transmission sites; the switchgear and the asset owner's standard decide which applies.

What does a 230Vac to 110Vdc power supply do?

A 230Vac to 110Vdc power supply is a rectifier or battery charger that converts single-phase mains AC to a 110V DC bus. In a substation DC system it also keeps the station battery charged, so the battery can take over on loss of AC. Substation chargers typically take a 230Vac single-phase or 400Vac three-phase input.

Are nickel-cadmium batteries still used in substations?

Yes, but mostly in existing installations. Vented NiCd was once a common zone substation standard; today NiCd is mostly installed as a like-for-like replacement, with VRLA the standard for new builds. A 110V NiCd battery uses around 88 cells, and NiCd tolerates a much wider temperature range than VRLA.

Do VRLA station batteries need ventilation?

Yes. VRLA can generally sit in a relay room with adequate ventilation, while vented lead-acid and NiCd batteries need a dedicated battery room. Ventilation is typically calculated to IEC 62485-2, or AS 2676.2 where the specification calls for it, to keep hydrogen in the battery space below 2% by volume.

Can lithium batteries replace VRLA or NiCd in a station battery?

Not as a standard option today. Lithium isn't yet a standard substation battery chemistry, and there are no defined standards for lithium in substation use. Where lithium is trialled, IEC 62619 and IEC 62485-5 apply.

How is a 110V DC auxiliary system different from a 48V telecom system?

A 110V DC auxiliary system powers protection, control and switchgear, while a 48V system typically powers communications equipment. Protection and control DC supplies are commonly run unearthed (floating) for reliability, while communications DC supplies are often positively earthed to limit interference. Many substations run both systems side by side.

Powerbox Pacific

110V and 125V DC systems for utilities and industry


Powerbox Pacific designs and builds complete 110V and 125V DC power systems in New Zealand for substations, utility assets and industrial switchrooms, and supplies the components behind them, including battery chargers from Schaefer and Camtec, and Premium inverters. If you are specifying a 110V or 125V DC auxiliary power system for a substation, mine, data centre or renewable connection project, contact us to discuss your project.

Written by Powerbox Pacific

Written by our team with reference to New Zealand utility DC design practice, IEC 62485-2 and IEEE 946.