Site Management and Remote Monitoring and DC Power Systems

Delta CU-31AF Site Controller for DC Power Systems

The Delta CU-31AF site controller runs the DC power system and makes remote site monitoring practical. It holds the system voltage, shares load across the rectifiers, manages battery charging and low-voltage disconnection, and watches mains, currents, temperatures and site alarms. Alarms and data go to your NMS or SCADA, so problems at a remote ...

Read More

The Delta CU-31AF site controller runs the DC power system and makes remote site monitoring practical. It holds the system voltage, shares load across the rectifiers, manages battery charging and low-voltage disconnection, and watches mains, currents, temperatures and site alarms. Alarms and data go to your NMS or SCADA, so problems at a remote site are found, adjusted and diagnosed before they become outages, without a site visit.

The CU-31AF has two CAN buses as standard: IMBUS for Delta modules and eNexus for Eltek modules. One controller manages Eltek Flatpack2 rectifiers, Rectiverters, DC/DC converters and MPPT solar chargers, on their own or alongside Delta modules in the same system. You choose modules on rating and availability, not on controller compatibility.

Optional functions extend control across the site: LVD control through a Delta LVD control board, AC and DC meter reading for supply and load monitoring, generator start and stop over RS485 Modbus RTU, and programmable PLC logic for fans, air conditioning, heaters and other site equipment.

Powerbox uses the CU-31AF as the controller across its DC power systems at 48, 110 and 220Vdc. It runs directly from 48Vdc systems, and on 110Vdc and 220Vdc Eltek systems a DC/DC converter, specified by Powerbox as part of the system design, supplies it from the system bus. The same hardware, configuration tools and alarm mapping apply across every Powerbox system type, and a Micro SD card backs up the site configuration, so there are fewer spares to hold and a replacement controller needs no reprogramming on site.

The CU-31AF is built on Delta's Orion controller platform, widely used by telecom operators and infrastructure owners in Europe and North America and in production in its current form since 2019. Delta is moving new controller production to Orion to meet the EU Cyber Resilience Act. Installed Eltek Smartpack systems remain supported, and where 1U of additional cabinet space is available, the CU-31AF can be retrofitted to an existing site with the Flatpack2 modules left in place.

Typical applications include 48Vdc telecommunications sites sending SNMP alarms to the operator NMS, industrial DC systems in rail, utilities and mining with Modbus integration to SCADA, and off-grid and hybrid sites running MPPT solar, Rectiverters, Polarium lithium batteries and optional generator control from one controller.

Powerbox designs, builds and commissions Delta and Eltek DC systems across New Zealand and Australia. Send us your system requirements or existing site details, and our engineers will specify the controller, modules and integration.

Show Less

Model:
Unit Price
—
or send a quick enquiry about this product only
Delta CU-31A F rack-mounted site controller, shown in an angled front view with display, Ethernet ports and green terminal connections.
Features
  • Two CAN buses as standard, IMBUS for Delta and eNexus for Eltek, so Delta and Eltek modules run in one system and you choose modules on rating and availability, not controller compatibility
  • Controls Eltek Flatpack2 rectifiers, Rectiverters, DC/DC converters and MPPT solar chargers over CAN, so mains, solar and DC/DC sources are managed from one controller
  • Holds the system voltage and shares load across the rectifiers, so modules no longer run at fixed settings with no visibility
  • Float and boost charging with temperature compensation, plus low-voltage disconnection of the battery or non-critical loads, protecting batteries from deep discharge
  • Five Hall effect DC current measurements across battery, load and solar branches, so each branch is monitored separately
  • Direct Modbus communication with Polarium lithium batteries, so battery status and alarms come from the battery management system instead of being estimated from shunt measurements
  • Polarium battery data reports in the same SNMP and Modbus views as the rest of the power system, giving one view of the site
  • Eight digital inputs for door, smoke, water leak, motion and other contact-closure alarms, bringing site alarms into the same controller as the power system
  • Four analogue inputs and two ambient temperature inputs, so third-party sensors and site temperature report through the controller
  • Six volt-free relay outputs, to signal alarms to other systems or switch auxiliary equipment
  • Colour touch display for local status, alarms and settings, so technicians can check and adjust the system at the cabinet
  • Web interface for local or remote access, so the system can be checked and configured over the network
  • SNMP v1, v2c and v3 over Ethernet, so alarms and data report directly to the operator NMS
  • Modbus RTU slave for SCADA and PLC integration and an RS485 Modbus RTU master for third-party devices, linking the power system to industrial control systems
  • One WAN and five LAN Ethernet ports, keeping the network uplink separate from local site devices
  • 100,000-record event and data log with remote firmware upgrade, so faults are diagnosed and firmware kept current without a site visit
  • Uploads measurement data and alarm events to Delta RMMS software, for central monitoring across sites
  • Micro SD configuration backup, so a replacement controller is loaded with the site configuration and needs no reprogramming on site
  • Runs directly from 48Vdc systems, with a DC/DC converter supplying it on 110Vdc and 220Vdc systems, so one controller covers the full Powerbox system range
  • Same hardware, configuration tools and alarm mapping across every Powerbox system type, so fewer spares are needed
  • Retrofits to existing Eltek sites with 1U of spare cabinet space, so Smartpack sites move to the Orion platform with the installed Flatpack2 modules left in place
  • Built on Delta's Orion platform, in production in its current form since 2019 and widely deployed across European and North American networks, so you get a proven controller platform
  • Natural convection cooling with no fans, operating from −40 to +70°C, so there are no fans to service at remote sites
  • Optional LVD control through a Delta LVD control board, for battery and non-critical load disconnection
  • Optional AC and DC meter reading, for supply and load monitoring
  • Optional generator start, stop and monitoring over RS485 Modbus RTU, for hybrid and off-grid sites with genset backup
  • Optional programmable PLC logic across the DI, DO and AI points, to control fans, air conditioning, heaters and other site equipment
Specifications
Input
Voltage (nominal) −54Vdc
Voltage range −18 to −60Vdc
110Vdc and 220Vdc systems Controller supplied by a DC/DC converter
Current 2.0A (max.)
Mechanical
Dimensions (W×H×D) 425×44×304mm (1RU, 19")
Weight 1.8kg
Standards
Cooling Natural convection, no fans
Operating temperature −40 to +70°C
Humidity 95%, non-condensing
Functions
CAN buses 2: IMBUS (Delta), eNexus (Eltek)
Digital inputs 8
Analogue inputs 4
Temperature inputs 2 (ambient)
Relay outputs 6 volt-free
DC current measurement 5 (Hall effect sensor)
RS485 Modbus RTU master ×1, Modbus RTU slave
Ethernet 1 WAN, 5 LAN
Data log 100,000 records
Configuration backup Micro SD card slot, configuration transferable between controllers
Firmware Remote upgrade
User Interface
User interface Colour touch display, web interface
Network protocol SNMP v1/v2c/v3
Extensions (Optional)
LVD control Via Delta LVD control board
AC and DC meters Supply and load monitoring
Genset control/monitoring Generator start, stop and monitoring over RS485 Modbus RTU
Configurable DO/DI/AI PLC Programmable PLC logic for fans, air conditioning, heaters and other site equipment
Ordering Information
Site controller CU-31AF-S
Accessories included Signal connectors, cable fixing kits
Downloads
Delta-CU-31AF-Site-Controller-Telecom-DC-Power-Monitoring-Datasheet.pdf
Warranty & Returns

Warranty periods vary by product. Please refer to the Powerbox Warranty Policy for the applicable coverage period against manufacturing defects from date of purchase. For returns and RMA requests, please visit our RMA support page or contact our support team directly.

FAQs
Eltek Flatpack2 series rectifiers, Rectiverters, DC/DC converters and MPPT solar chargers, controlled over the eNexus CAN bus.
Yes. Delta modules connect on IMBUS and Eltek modules on eNexus, both managed by one controller.
Yes. The controller needs a −18 to −60Vdc supply, so on 110Vdc and 220Vdc systems a DC/DC converter steps the system voltage down to power it. The controller monitors and controls the Eltek modules over eNexus in the same way as on a 48Vdc system.
Yes. It communicates directly with Polarium lithium batteries, so battery status and alarms come from the battery management system and report through the controller's SNMP and Modbus interfaces.
Optional expansion modules add digital inputs and outputs, current and temperature measurement, fan control and LVD control. They connect over the IMBUS CAN bus, and Powerbox specifies them as part of the system design.
Yes, provided 1U of additional cabinet space is available. The installed Flatpack2 modules stay in place. Each site is different, so Powerbox assesses retrofits individually. Contact us with your site details.
SNMP v1, v2c or v3 over Ethernet, or Modbus RTU over RS485.
The configuration is backed up to the Micro SD card. Fit the card to the replacement controller and load the configuration.
No. It runs on natural convection from −40 to +70°C.